Subsea operational update:
The MC252 well has been shut-in since July 15; there is currently no oil flowing into the Gulf.
The DDII continues to conduct diagnostic tests on the MC252 well, and plans are being developed for final plugging and abandonment procedures as overseen by the Bureau of Ocean Energy Management (BOEM).
A lock down sleeve to secure the well MC252 well casing hangar and the annulus was successfully installed and tested Saturday, Sept. 11.
The DD III relief well drilling operations re-started today at 1:40 p.m. CDT.
Updated Sept. 13 at 2:30 p.m. CDT --for up to the minute information, go to http://www.destinhomerealtor.com/ or http://www.oilslickdestin.com/ or send email to MykeSaysSold@aol.com
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment